• Playbook
  • Marketing
  • 5 min read

A Content Engine in 90 Days

Topic, brief, draft, fact gate, approval, pull request, measure. The cadence comes from the loop, not from a calendar.

Author
ftes.ai Editorial
ftes.ai Team

The short answer

Building a content engine in 90 days with a Content & SEO Engineer Digital FTE runs the pipeline gated from week one: confirm the Brand Brain and approved sources, choose the publishing route with your engineers, approve topics with worth-it verdicts, pass every draft through the fact gate, and merge approved pieces as pull requests.

The role this piece is aboutContent & SEO Engineer Digital FTE · Inbound Marketing

Key takeaways

  • Confirm the Brand Brain and approved sources before the first topic; every draft is built on them.
  • Choose the route with the engineers: pull request for a repository site, endpoint package otherwise.
  • Every topic gets a worth-it verdict; every draft passes the fact gate before you see it.
  • A pull request is a reviewed change; publishing keeps the engineers' own gate.
  • Cadence emerges from the loop; do not set a calendar the evidence does not support.

Step 1 (week 1): confirm the Brand Brain, the sources, and the baseline

Review the Brand Brain the Content & SEO Engineer Digital FTE built from your documentation, guidelines, and existing pages: product facts, voice, vocabulary, the claims the brand never makes. Set the approved sources for the fact gate per property: documentation, policy pages, named public sources. Record the baseline: pieces published per month, revision rounds per piece, and the console and citation record for the questions you want to be visible for.

Write the fan-out list for the first three primary questions with the FTE, so the first topics have somewhere to go.

Step 2 (week 1–2): choose the publishing route with the engineers

If the site is a repository, connect it with a token that can open pull requests but not merge, scoped to the property. If it is not, install the open-source endpoint package in the site once, with the engineers reading it first. Either way, the engineers' involvement afterwards is the review they already do for any change, and nothing publishes without their merge or the endpoint's confirmation.

Agree the pull request convention: content in the repository's format, sources in the description, the fact-gate result stated.

Step 3 (weeks 2–6): run the pipeline gated and read the reasons

Topics arrive with worth-it verdicts; approve the few yeses. Drafts arrive having passed the fact gate, with sources attached and the gate's result stated; review for judgement and tone, send back with reasons. Approved pieces open as pull requests; engineers merge. Read the send-back reasons weekly and correct the Brand Brain; by week six the reasons should be about tone, not facts.

Hold the first monthly review at day 30: pieces approved and merged, approval rate with reasons, fact-gate blocks and what they revealed, usage. Promote nothing.

  • Topic: worth-it verdict, approved by you
  • Draft: through the fact gate, sources attached
  • Approval: judgement and tone
  • Pull request: reviewed and merged by engineers
  • Measure: sampled, dated, honest
Topicworth-it verdictBrieffan-out plannedDraftfrom the Brand BrainFact gateunsourced claims blockedApprovala named personPublishyour routeMeasuresampled, datedNOTHING GOES LIVE WITHOUT A NAMED PERSON · EVERY STAGE IN THE AUDIT TRAIL
Figure 1The seven stages the playbook runs every week, with the fact gate before the approval gate and the pull request as the publish step. Nothing goes live without a person and a merge.

Step 4 (weeks 7–10): let the cadence emerge and build the cluster

By the second cycle the send-backs are few, the pull requests merge quickly because the convention holds, and the FTE's topic proposals draw on the measurement of the first pieces. Build the cluster: the sub-queries still uncovered become the next verdicts, each new piece links three related ones and names the same entities the same way, and voice-ready FAQs go on every piece. The cadence is whatever this loop sustains; it is not set in advance.

Where a real video exists for a piece, plan chapters to the H2s and publish the transcript with it.

Step 5 (weeks 11–13): the quarterly comparison

At the quarterly review, compare against the baseline: pieces published per month that passed the fact gate, revision rounds per piece against the old freelance or in-house number, console and citation movement for the target questions, approval rate, usage, and cost per published piece against what a piece cost before. Label what is unmeasured. Decide the three things, and keep publishing gated; a merge by an engineer is the right gate for a site.

Write the review note and set the second quarter's fan-out list.

What does done look like at day 90?

Done is a pipeline that runs every week with a topic verdict, a sourced draft, a human approval, and a merged pull request; a cluster growing from evidenced gaps; a Brand Brain that produces drafts right in substance; engineers who see a well-formed pull request rather than a request for their time; and a quarterly comparison read from the record. The content lead spent minutes a day on verdicts and drafts and an hour a month on the review.

It is not a content factory; every piece carries a source on every claim and something the index lacked, which is why the engine is worth running.

What should you refuse to do in the first quarter?

Refuse a fixed calendar before the loop has shown what it sustains. Refuse to let the FTE merge; the engineers' gate is part of the design. Refuse to approve a draft the fact gate blocked by adding a source afterwards. And refuse topics whose verdict was no because someone wanted the page; the verdict's reasons are usually right, and overturning it is logged for the review to read.

The engine's quality is the sum of these refusals.

Frequently asked questions

What comes first?

Confirming the Brand Brain and the approved sources, then recording the baseline and writing the first fan-out list. Every draft is built on the memory.

How do engineers get involved?

Once, to connect the repository or install the endpoint package, then only to review and merge pull requests as they do for any change.

How is cadence decided?

It emerges from what the loop sustains in the second cycle. A calendar set in advance is not supported by evidence.

Does the FTE ever merge?

No. The pull request is merged by the engineers, which keeps their gate in place.

What does the quarterly review compare?

Pieces published, revision rounds, console and citation movement, approval rate, usage, and cost per piece against the baseline, with unmeasured items labelled.

  • Playbook
  • Marketing
  • Content FTE
  • Pull requests
  • 90 days
Further reading

Keep going.

Related guides on hiring and managing Digital FTEs.

Whitepaper · 12 min

Whitepaper: Publishing Pipeline Architecture for AI-Written Content

How content written by a Digital FTE reaches a live website without a human losing control: the pipeline stages, the fact gate, the approval gate, three publishing routes including pull requests and a customer-installed endpoint, and the audit trail from topic to live page.

Read

Ready to hire your first Digital FTE?

Pick a role, connect the tools it needs, and review its first proposals this week.